Chandrayaan 2 To Launch In July, Marking India’s Second Moon Mission
Harin
After multiple delays, the final launch for the Chandrayaan 2 mission is now scheduled for July, between the 9th to 16th, based on weather conditions.
- Delhi Is The World’s Most Polluted Capital City For Three Years In A Row
- Indian Farmers Install High-Tech, Night-Vision CCTV Cameras To Protect Themselves
- Looking For The Best Electric Bike In India 2021? Take A Look At These
10 years ago, with the first Chandrayaan mission, India wrote its name in record books. One of the mission’s objectives was to detect whether water existed on the moon surface or not. With bigger dreams to achieve and several delays later, finally, the Chandrayaan 2 will be launched later this year. Below are things you should know about India’s second moon mission.
The Chandrayaan 2 mission was actually scheduled to launch last year but the vehicle’s further tests and configuration changes delayed the launch date several times. This time, ISRO announces that the final launch is in July, based on the weather conditions, it can be somewhere between July 9 to 16. The landing will probably fall on Sep 6.
There are three modules included in the mission: a lander, an orbiter, and a rover, all of which will be built in India. Once the launch is successfully completed, the lander will detach from the orbiter and make a soft landing on the surface of the moon. The touchdown location has already been chosen to be close to the moon’s south pole. To date, no other country has studied this particular part of the moon. By being the first country to explore this area, not only India will be on the space exploration map but also get the chance to name the location.
The lander and the orbiter will be launched aboard the Launch Vehicle Mark 3 from the Satish Dhawan Space Centre located in Sriharikota. There are specific experiments for each module to execute.
After landing, the Pragyan rover will travel for around 300 to 400 meters on the moon. The rover was supposedly designed by Russia but the efforts proved to be unsuccessful. ISRO then designed and built it themselves while the vehicle’s mobility subsystems were developed by IIT Kanpur.
If the launch is carried out successfully, India will officially be the fourth nation made it to the moon, following China, Russia, and the U.S. Last month, Israel’s Beresheet spacecraft mission almost succeeded but due to some difficulties, it crashed onto the lunar surface.
After each test, the Chandrayaan 2 will report back to Earth. According to estimation, the mission will last for about 15 days for the rover and the lander, while for the orbiter, it will be a year-long mission. If this mission proves to be as successful as the previous one, it will be an exceptional achievement for India.
Featured Stories
ICT News - Jul 05, 2025
Windows 11 is Now the Most Popular Desktop OS in the World
ICT News - Jul 02, 2025
All About Florida’s Alligator Alcatraz: A Smart Move for Immigration Control
ICT News - Jun 25, 2025
AI Intimidation Tactics: CEOs Turn Flawed Technology Into Employee Fear Machine
ICT News - Jun 24, 2025
Tesla Robotaxi Finally Hits the Streets: $4.20 Rides That'll Make You Hold Your...
ICT News - Jun 24, 2025
World's First Flying Humanoid Robot Takes Flight
ICT News - Jun 24, 2025
When Closed Source Met Open Source: Bill Gates Finally Meets Linus Torvalds After...
Gadgets - Jun 23, 2025
COLORFUL SMART 900 AI Mini PC: Compact Power for Content Creation
ICT News - Jun 22, 2025
Neuralink Telepathy Chip Enables Quadriplegic Rob Greiner to Control Games with...
ICT News - Jun 20, 2025
Tesla vs Zoox vs Waymo: Who would win?
ICT News - Jun 19, 2025